Back
PARTICULAR OBLIGATIONS AND PROCEDURES
1-A
GENERAL AND PARTICULAR CONDITIONS FOR TENDERERS
1-B
LOCAL AUTHORITIES PROCEDURE, APPROVAL, INSPECTION AND FEES
1-C
CONTRACT DOCUMENTS
1-D
CONTRACTORS/MEP SUB-CONTRACTORS’ OBLIGATIONS
1-E
SHOP DRAWINGS
1-F
PROCUREMENT/TECHNICAL SUBMITTAL
1-G
SAMPLES
1-H
ELECTRICAL POWER SUPPLY
1-I
SITE SAFETY REQUIREMENT
1-J
SITE ENGINEERS AND AUTHORITIES
1-K
STORAGE MATERIAL AT SITE
1-L
PROTECTION OF INSTALLED MATERIAL
1-M
INSPECTION OF DELIVERED MATERIAL
1-N
BUILDERS WORK, SLEEVES AND BOXES
1-O
ACCESS DOORS, ACCESS PANELS
1-P
QUALITY OF WORK AND WORKMANSHIP
1-Q
WELDING WORKS - AUTHORIZED WELDERS
1-R
FIRE-ZONES
1-S
SITE CLEANING
1-T
REQUEST FOR INFORMATION (RFI)
1-U
REQUEST FOR INSPECTION
1-V
REPORTS (DAILY-WEEKLY)
1-W
TESTING, PRE-COMMISSIONING AND COMMISSIONING
(HVAC-MECHANICAL SYSTEM)
1-X
AS-BUILT DRAWINGS & OPERATION MAINTENANCE MANUAL
1-Y
REQUEST FOR PRELIMINARY HANDING OVER
1-Z
WARRANTIES
1-AA
SNAGS
1-BB
TRAINING
1-CC
PRELIMINARY HAND OVER CERTIFICATE
1-DD
DEFECTS, LIABILITIES AND MAINTENANCE
1-EE
REQUEST FOR FINAL HANDING OVER
1-FF
FINAL COMPLETION CERTIFICATE
1-GG
METHOD STATEMENT
1-HH
SOUND CONTROL
Powered by
Hydro